11/7/14

Site Preparation Oil and Gas Well Area




After All the surveys carried out and the data obtained indicate the area contains oil or gas reserves stored in reservoirs favorable, the next stage is no land preparation (site preparation). Land preparation herein include social aspects, licensing and technical environmental impact control.

During the drilling process must comply with codes, standards and regulations berkalu country and local area. In the area of land preparation to be released should refer to the applicable safety standards such as OSHAS, NFPA, kupak etc.

In Indonesia's Pertamina safety standards refer to KUPAK. In kupak regulates the safety distance between the wells to a safe area and the distances between facilities or equipment in the area of the well. Of the minimum distance KUPAK disaratkan obtained the minimum width should be released or the extent of the required one well or cluster.

All the equipment used during the drilling process such as RIG, heavy equipment must be feasible and certified according to safety standards issued by the authorities. For personnel must use personal protective equipment such as helmet standards, google glass, safety boots and full body hardness what if this is altitude.

1 comment:

  1. It's impressive to see how much thought and planning goes into designing an oil production well. This post highlights the importance of considering factors such as reservoir pressure and oil viscosity when determining the minimum surface area needed.
    Freture Techno

    ReplyDelete

MATERIAL AND EARTH WORK SPECIFICATION

Borrow Material Borrow material shall meet the requirement specified for satisfactory fill materials per ASTM D2487 or ASTM D...