No posts with label Electrical. Show all posts
No posts with label Electrical. Show all posts
Subscribe to:
Posts (Atom)
MATERIAL AND EARTH WORK SPECIFICATION
Borrow Material Borrow material shall meet the requirement specified for satisfactory fill materials per ASTM D2487 or ASTM D...
-
The drain system design is based on segregated systems, described below. The Open Non-Hazardous Drainage System provide drainage fo...
-
1.0 INTRODUCTION The purpose of this calculation note is to provide the preliminary sizing of Closed Drain Drums at the NGL Plant. P...
-
For preliminary engineering the guidelines given below should be followed. A preliminary network analysis will also be undertaken...